Our Work > Bridges & Infrastructure > Scott & Bryson Drains Timber Bridge Rehabilitation

Scott & Bryson Drains Timber Bridge Rehabilitation

As the successful bidder, Ernst Hansch Construction Ltd. was awarded the Manitoba Infrastructure contract to complete the Stringer Strengthening for Two Treated Timber Bridges project over the Scott and Bryson Drains on Provincial Road 248.

Utilizing vertical and horizontal fiberglass rods with epoxy adhesive to strengthen the existing treated timber bridges, this work was done without disrupting traffic flows.

Learn More About Our Services
Download PDF
Learn More About Our Services