Our Work > Industrial > Miller Waste Building Alterations

Miller Waste Building Alterations

  • Client: Miller Waste Inc.
  • Location: 1451 Saskatchewan Avenue, Winnipeg MB
  • Size: 98,000 sq.ft.
  • Completed: April 2018

  • Project Type: Industrial
  • Services Used:

Ernst Hansch Construction Ltd. was awarded a construction management contract by Miller Waste Inc. to modify their 1451 Saskatchewan Avenue building. from a warehouse to an operations, maintenance and storage facility to house their 50+ garbage collection trucks. This project included design work, permitting and construction.

During the construction phase of the above works, Ernst Hansch Construction Ltd. also completed upgrades to the roof and building envelope, office spaces, and washrooms at this location for Miller Waste Inc.

  • Client: Miller Waste Inc.
  • Location: 1451 Saskatchewan Avenue, Winnipeg MB
  • Size: 98,000 sq.ft.
  • Completed: April 2018

  • Project Type: Industrial
  • Services Used:
Learn More About Our Services
Download PDF
Learn More About Our Services