Our Work > Industrial > Burnbrae Farms Clean Room & Silo Foundation

Burnbrae Farms Clean Room & Silo Foundation

  • Client: Burnbrae Farms Limited
  • Location: Winnipeg, MB
  • Size: Various
  • Completed: July 2001

  • Project Type: Industrial
  • Services Used:

Working together for over 20 years, Ernst Hansch Construction Ltd. has completed a number of projects for Burnbrae Farms Limited at their Winnipeg locations. One of these projects was an egg processing Clean Room at Burnbrae Farm’s Wellington Avenue location and construction of a concrete foundation, built to support two 6,000 gallon silos for the storage of processed eggs.

Applying value engineering, Ernst Hansch Construction Ltd. completed the design build of this project to CFIA standards. Construction included specialized approved products and techniques such as Stonehard epoxy flooring and a Zeroloc insulated metal panel wall system. A HEPA filtered HVAC system was also installed to meet the required air quality.

Some of the other projects completed by Ernst Hansch Construction Ltd. for Burnbrae Farms were multiple interior renovations, design and construct interconnection of two adjacent buildings, cooler and cooler / freezer storage room projects at their Pandora Avenue, Kernaghan Avenue and Wellington Avenue locations.

  • Client: Burnbrae Farms Limited
  • Location: Winnipeg, MB
  • Size: Various
  • Completed: July 2001

  • Project Type: Industrial
  • Services Used:
Learn More About Our Services
Download PDF
Learn More About Our Services